
Tests were conducted today on newly installed fitness equipment at
Honoka'a Elementary School. The equipment sits on a special padded surface that is meant to absorb the impact of students should they fall from the equipment to the ground. The inspection involved
dropping a measurement instrument from the height
of six feet and determining the level of impact on the cushioned surface.
The contractor is currently awaiting approval to complete cement work to reattach sidewalks from the play area to the adjacent building. Once this is completed, students will be able to enjoy the new equipment. Identical equipment was also installed at
Paauilo School.
No comments:
Post a Comment